Information about investment sites № 1
Area № 1
1. The site |
The City Of Kirsanov |
|
2. Сategory of land |
Lands of residential settlements |
|
3. Area, ha |
13,0 |
|
4.Form of ownership |
municipal ownership |
|
5.Possibility of expansion |
there |
|
6.Proposed directions of use |
For industrial facilities, public utilities, transport facilities, communication facilities |
|
7.The presence of buildings and structures |
no |
|
8. |
The availability of infrastructure and communications |
The distance from the boundaries of the land (м) |
gas |
there (150) |
|
electricity |
there (100) |
|
water |
there (150) |
|
sanitation, water drainage |
there (200) |
|
highway, motorway |
asphalt coating (100) |
Passport of the investment site №1
1.General information |
|
1.1. Type of the site (brief description) |
waste ground |
1.2. Cadastre number |
|
1.3. Form of ownership of land and buildings (ownership, lease, other) |
municipal ownership |
1.4. Legal (postal) address, phone (area code) ,e-mail,website |
Kirsanov |
1.5. The contact person |
Strusova Valentina |
1.6. Post |
The Deputy head of the city administration |
1.7. Telephone |
8 (47537) 3 50 67 |
1.8. Fax |
8 (47537) 3 45 70 |
1.9. Email |
econ@g37.tambov.gov.ru |
1.10.Website |
|
2.The site |
|
2.1. The address of the site |
Tambov region, Kirsanov |
2.2. The location on the site of the operating organization |
no |
2.3. In the city |
yes |
2.4. Distance from city of Tambov |
100 |
2.5. In the protected zone of cultural heritage sites (monuments of history and culture), directly in the cultural heritage |
|
2.6.The distance to highway, km |
0,1 |
2.7. Distance from railway station, km |
6,0 |
2.8. From airport, km. |
|
2.9. Nearby production facilities (industrial, agricultural, other) and the distance to them, km |
NOandSK (industrial),0,3 |
2.10. The nearest residential buildings, km |
0,1 |
3. Characteristics of the investment site |
|
3.1. Area, ha |
13,0 |
3.2.The presence of buildings and structures (list) |
no |
3.3. Expandability |
yes |
3.4. Category of land |
Lands of the settlements |
3.5. Functional area |
Industrial building |
3.6. The presence of barriers (yes, no) |
no |
3.7. Relief, type of ground (flat, sloping, terraced, ledges) |
Quiet with a slight slope to the South |
3.8. The current use of the site |
wasteland |
3.9. Proposed directions of use |
For industrial facilities, public utilities, transport facilities, communication facilities |
4. Infrastructure |
|||||||
Asset |
Available |
Unit of measure |
Power |
The remoteness of the site from the source , м |
The possibility of increasing the power (until ) |
The possibility of intermittent |
|
Water supply (d=300мм.) |
yes |
м3/year |
1168000 |
150 |
1825000 |
no |
|
Electricity |
yes |
kWt |
10 |
100 |
|
no |
|
Heating |
|
Gcal /hour |
|
|
|
|
|
Sewerage (d=300мм.) |
yes |
м3/year |
912500 |
200 |
1095000 |
no |
|
Gas (d=150мм.) |
yes |
м3/year |
Efficiency GRS 45000м3 |
150 |
|
no |
|
Fallow |
|
bar |
|
|
|
|
|
Clearing constructions |
|
м3/year |
|
|
|
|
|
Pressure air |
|
м3/year |
|
|
|
|
|
5.Communication on the territory |
|||||||
5.1.Road (type, coating, length, etc.) |
- |
||||||
5.2.Railway line (type, coating, length, etc.) |
- |
||||||
5.3. Telecommunications network (telephone, Internet, other) |
- |
||||||
6.Buildings and structures on site |
|||||||
Оbject name |
Square , м2 |
Floors |
Ceiling height , м. |
Type Designs |
The degree of completion (% or other ) |
Year built and assessment of the current state |
As currently used (% or other ) |
|
|
|
|
|
|
|
|
7.Human resources (the population of the nearest settlements) |
|||||||
g. Kirsanov 17.3 thousand people |
|||||||
8.Terms of the acquisition (use) of the site (purchase, rent, etc.) |
|||||||
8.1.The terms of the lease (purchase of the plot) |
Rent or sale |
||||||
8.2.The estimated cost of the rental |
|
||||||
8.3.Other costs associated with the acquisition of the site (topographical, cadastral plan, survey, etc.) |
|